Decoration flow chart

Decoration flow chart

Remove the wall according to the design drawing , Re planning and adjusting the space .
hydropower : land , wall , Top grooving and water supply pipeline , Circuit laying , And water supply , Detection of electrified facilities and wall repair .
Clay tile : Floor tiles , kitchen , Waterproof treatment of toilet and ceramic wall tile laying , Completion maintenance .
carpentry : Ceiling wall keel laying , Panel installation and fabrication , Door pocket , Window cover making , Wall decoration construction , Production of wooden fixed furniture and installation of wooden components .
In a nutshell , The decoration is divided into the following 20 Steps :1, Pre- design ;2, Demolition and reconstruction of main body ;3, Hydropower transformation ;4, carpentry ;5, Tiling ;6, Paint the wall ;7, Kitchen and bathroom ceiling ;8, Cabinet installation ;9, Wooden door installation ;10, Floor installation ;11, Wallpaper placement ;12, Radiator installation ;13, Installation of switch socket ;14, Lamp installation ;15, Installation of hardware and sanitary ware ;16, Curtain rod installation ;17, Pioneer and keep clean ;18, Furniture entering ;19, Home appliance installation ;20, Home decoration .